When I just built the house the hvac contractor gave me a better price to do a 5 ton climatemaster geothermal unit on the house and the shop so i did both.
well I just had the shop spray foamed with 2 inches of closed cell on the ceiling and 2 inches on the walls and I am wondering if maybe up by the ridge cap if they sprayed it properly because the heater is kicking on and the unit cant warm it so the 2nd stage kicks on and runs for a really long time before getting the temp to 65degrees
I will post screenshots from both of my ecobee thermostats the house is set to 70 and the shop 65 and you can see the house doesnt turn on the 2nd stage at all i feel something is wrong.
well I just had the shop spray foamed with 2 inches of closed cell on the ceiling and 2 inches on the walls and I am wondering if maybe up by the ridge cap if they sprayed it properly because the heater is kicking on and the unit cant warm it so the 2nd stage kicks on and runs for a really long time before getting the temp to 65degrees
I will post screenshots from both of my ecobee thermostats the house is set to 70 and the shop 65 and you can see the house doesnt turn on the 2nd stage at all i feel something is wrong.