Well it was a reasonably productive weekend at the shop, although the pictures don't really show it. I was over there most of the day Saturday and Sunday. I put down the RaceDeck flooring in the bathroom, installed the toilet, light, baseboard heater, thermostat, and made the electrical connections for the hot water heater. All the lights for the main shop areas were controlled by breakers, so I put 6 light switches in. I also fixed the latch on the front door to help secure it. Several hours were also spent Saturday morning picking up some stuff I bought from HGR Industrial Surplus.
The main project I finished though was the 2 post lift installation. It took alot longer than I planned, I had help standing up the first column, but everything else was done by myself and forklift. The instructions left alot to be desired, I probably spent more time figuring out how things were supposed to go than actually working. The next lift install I end up doing will go alot quicker though. I am very happy with the lift, it seems to be excellent quality and is very sturdy. The Neon is the only car I have had on, and granted it is well below the 10,000 pound capacity, but nothing flexed or moved at all on the lift it is rock solid. Here are some pictures: