5/8" wallboard max ceiling span

59ctd

Well-known member
Joined
Apr 1, 2006
Messages
78
Location
Lakeville, Minnesota
My son and I are finishing the last basement bedroom and are building a box around the ductwork. Most wallboard will be 1/2" but I am wondering if we can get away with 5/8" wallboard spanning the main heat run in the center and the two air vent ducts on the right. Plan is to put a 2x4 or similar on the right wall where the flexible cold air duct is sagging in this pic. That would be about a 28-29" span between there and the I beam just left center by the heat duct. If 28-29" is too far then we would need to add a bunch of 2x4's at 90* orientation and loose another 1.5" of ceiling height.
1701082129532.jpeg
 
To avoid these ads, REGISTER NOW!

mike93lx

ALLIANCE MEMBER
Joined
Dec 9, 2013
Messages
38,176
Location
Richmond, VA
24OC is what I have always seen as a limit. That said, if headroom is tight, I'd probably just send it at 28-29OC. Could also strap it with 1x and only lose 0.75"
 

BillK

Well-known member
Joined
Aug 24, 2006
Messages
9,394
Location
Beautiful Southern Maryland
I would be that even 1/2" will be fine. My entire house is 1/2" with trusses on 24" centers and there is not a bit of sag anywhere that I know of. I doubt that the extra couple of inches will make any difference. It almost looks like you could get a 1x laid flat across under the duct for some extra support.
 

geneg

Well-known member
Joined
Oct 19, 2020
Messages
468
Location
Midwest
Run your 2x4 nailer along the right hand side. Screw decent quality 1/2" plywood across the nailer & floor joists as far as you need to. Glue and screw your sheetrock to the plywood. Won't sag & you can trim it with a cove mold or 1/4 round painted ceiling color. Actually the 5/8 @ 29" probably wouldn't be an issue. But since it is a basement- I'd rather be safe than sorry.
 

wssix99

Well-known member
Joined
Mar 2, 2011
Messages
5,167
Location
Chicago, IL
Run your 2x4 nailer along the right hand side. Screw decent quality 1/2" plywood across the nailer & floor joists as far as you need to. Glue and screw your sheetrock to the plywood. Won't sag & you can trim it with a cove mold or 1/4 round painted ceiling color. Actually the 5/8 @ 29" probably wouldn't be an issue. But since it is a basement- I'd rather be safe than sorry.

This is what I would do. Although, I would laminate plywood to the back of the drywall (with construction adhesive) before putting it up, so you don't need to put screws in the field and worry about piercing your ducts.
 
To avoid these ads, REGISTER NOW!
OP
5

59ctd

Well-known member
Joined
Apr 1, 2006
Messages
78
Location
Lakeville, Minnesota
My son put in the 2x4 nail board on the right. Ends up the two are roughly 27" apart so we are just going to wallboard over it. Neither of the vent pipes will put any pressure on the rock so it should be alright. There is a lot goin on above the gray flexi duct pipe above the doorway. That is where I ran all electrical, gas, phone, and 6x CAT6 cables from the basement utility room out to my shop addition back in 2006.
1701101813964.jpeg
 
OP
5

59ctd

Well-known member
Joined
Apr 1, 2006
Messages
78
Location
Lakeville, Minnesota
Never had any drips from there in 27 years but maybe I will throw some poly on before the wallboard goes up below the ductwork.
 