Well now that I have power I make a few calls to see if I can get the HVAC system installed, up and running.....they showed up after work one night to knock out the ductwork....
It's a two ton system, with one main trunk line with 6 supply lines and a single return:
I have plans for a crapload of super HO florescent 8' lights all over the shop, but only after the Sheetrock is in, so I wired two 100W attic lights for the time being. They light the whole place pretty good......now all I need is to finish the insulation in the ceiling.....
anyone have some extra $$$ they can spare?
It's a two ton system, with one main trunk line with 6 supply lines and a single return:
I have plans for a crapload of super HO florescent 8' lights all over the shop, but only after the Sheetrock is in, so I wired two 100W attic lights for the time being. They light the whole place pretty good......now all I need is to finish the insulation in the ceiling.....
anyone have some extra $$$ they can spare?
HAHA Seriously,looking forward to the continuing adventure in shop construction,here's to completion