Rockerbox1
Well-known member
8 - 2by6by8
+
4 - 2 by4by8
+
2 hours
=
these quick and simple bunkbeds.
needed to build a set of bunkbeds for my daughters, and threw these together pretty quick. course after they were built it took another 3 or so hours to sand and stain them, but all in all, a fun project for the afternoon.
I could have stained them a bit quicker and a LOT better finnish if I had taken them apart to stain, but don't have the room for 16 individual pieces of wood laying around to stain.
I know there was a thread about building with 2 by 4's but I couldn't find it, so if someone wants to merge this post into that thread.... go for it
tools used;
circular saw, tape measure, cordless drill, speed square, random orbit sander
+
4 - 2 by4by8
+
2 hours
=
these quick and simple bunkbeds.
needed to build a set of bunkbeds for my daughters, and threw these together pretty quick. course after they were built it took another 3 or so hours to sand and stain them, but all in all, a fun project for the afternoon.
I could have stained them a bit quicker and a LOT better finnish if I had taken them apart to stain, but don't have the room for 16 individual pieces of wood laying around to stain.
I know there was a thread about building with 2 by 4's but I couldn't find it, so if someone wants to merge this post into that thread.... go for it
tools used;
circular saw, tape measure, cordless drill, speed square, random orbit sander



)
, does make awesome REAL butcher-block cutting boards).