Hello my friends, yes it has been a while since i have posted. I am sorry for not stopping in. I have been dealing with some very very serious personal matters that are going to take a lot of my attention for a while. I am sorry i cannot share in any meaningful way. At least not for now. - I hope you will understand.
As far as shop content, i hope the following will satisfy your appetite for a while.
First thing i needed to do was extend the power to the mig feeder to the back corner of the shop. I did this by using disconnects that matched my stick welder extensions on the CV power supply.



The feeder reached back into the corner, where i was able to tune it to make some nice welds, the voltage on the power supply needed to go up a good bit. Once tacked in place, i pulled them down one by one and fully welded the beams.
Then after that, i cut out the center uprights at the beam level and now i am ready to get some lumber across the beam pockets and deck the mezz all the way over to the wall. Under we will be moving the tire machines, and the hydraulic crimper. And the bikes will be going up onto the mezz, along with some lumber. I also should be able to put the pallet jack up there to move things around as needed.
Theres where we are right now. I hope to make more updates soon.
Thanks for stopping in. L8ter!