Got the ceiling done yesterday, all the way over to the wall. I'm now free to finish the shelves and load them up. I have a bit of a dilemma though, I need more material for shelving, but the material i have available is still in the mezzanine. I really need that unloaded and disassembled, but don't have the room for it. I might have to break down and buy more to get more off the floor. More likely i just let it sit for a month while i build the lean to.
I'll get a pic up later today. forgot to take the phone to the shop yesterday.