rjn2649
Well-known member
OK so the foam pad under my unit is going (gone) bye-bye.
How realistic is to think I could S-L-O-W-E-L-Y lift it up, I mean over the period of a couple weeks with a sling from above.
Pull out whats left of the old pad and slide a new pad under it,
With out evacuating, cutting and re-soldering?
And what should I put under another plastic one? Or pour a concrete one under it?
Or was I up too late drinking last night to think this can be done?
How realistic is to think I could S-L-O-W-E-L-Y lift it up, I mean over the period of a couple weeks with a sling from above.
Pull out whats left of the old pad and slide a new pad under it,
With out evacuating, cutting and re-soldering?
And what should I put under another plastic one? Or pour a concrete one under it?
Or was I up too late drinking last night to think this can be done?

