I'm trying to figure out about how much rock I would need to bed a 24'' pipe in a ditch 30 inches wide and 100 feet long.... I need to have 5 inches of rock under the pipe and rock up the walls of the ditch to the top of the pipe. Just enough to leave the very top visible for inspection.... I figure the bottom 5'' of rock would add up to about 5 cubic yards over the width and distance of the ditch but I'm stumped on how to figure the rest.... Any ideas or formulas? Thanks!!