You are a much braver man than me. There's no force on this earth that could get me up on those planks.
What do you heat your shop with?
It was only 5' (1.5m) up. Still was a little shaky. I have a 2 step system. I have a kerosene torpedo I use to bring the shop up to temp. Goes from 39F (4C) to 70F (21C) in a little over an hour. But I have a really old propane shop furnace that keeps the temps stable. My old man got it for me for the princely sum of $0. Somebody was moving and didn't want it any more.
It's been 11 years to get it this far. Probably another 3 years to finish it. The top edge of the wood is getting a painted chair rail/shelf (working that currently). Above that will be drywall.I like the space you have. A shop takes a long time to get it how you want it. What are you going to finish the walls with.
Last edited:











