StupidSheet
Well-known member
I'm building a 26x48 shop which is 1248sq'. I bought 4 rolls of 300' pex and finished laying it out tonight. Looks like I'm going to be short about 150'. After reading on here I know that all loops need to be close to the same length. I don't even know what to do now. Do I change the layout to try get closer to all even loops? I'm just totally lost and frustrated. To top it off I was supposed to pir this Saturday but my concrete guy cancelled on me. Another month it it will be getting cold here. I need some help!