Wastedwagesracing
Banned
- Joined
- Nov 21, 2007
- Messages
- 613
It seems like most of the floor systems require a pre prep of blast or etch. I have been steering away looking at those options because I don't fully understand the etching process. Can someone please explain it to me. Thanks
