I have all of my drywall out in prep. for instaling OSB and external wiring run through metal electrical pipe. SO.... i was thinking of adding a jib crane or a rolling engine hoist to help me move around stuff or just to hold while i spray it. Any ideas or advice?
It only needs to hold 100-200 lbs so i'm thinking i can weld one up from sq. tubing and bolt it to a beefed up section of the wall?
It only needs to hold 100-200 lbs so i'm thinking i can weld one up from sq. tubing and bolt it to a beefed up section of the wall?
