I realize this question has been asked a lot around here, but after searching I couldn't find my exact scenario. So briefly here it is, adding a sub-panel about 1 foot from the main panel in my basement. I have 100a service to the main, wanting to feed say 60 a to the sub, it's a Siemens 120a 12 position.
I mounted it on the wall on 3/4 plywood like the main panel is and my questions are:
Do I need to run the feeder in conduit or in any fittings?
Do exiting circuits needs to be in clamp fittings?
As for feeder cable, I have 4ga AL and 4ga (fine strange) copper, will either work?
Lastly, I assume it needs it's own ground that's clamped onto the ground rod where the main panel's is.. not tied 'to' the main ground wire yeah?
Thanks!
(pic attached)
((I did NOT wire the OG panel.. but I am planning on cleaning that mess up))
I mounted it on the wall on 3/4 plywood like the main panel is and my questions are:
Do I need to run the feeder in conduit or in any fittings?
Do exiting circuits needs to be in clamp fittings?
As for feeder cable, I have 4ga AL and 4ga (fine strange) copper, will either work?
Lastly, I assume it needs it's own ground that's clamped onto the ground rod where the main panel's is.. not tied 'to' the main ground wire yeah?
Thanks!
(pic attached)
((I did NOT wire the OG panel.. but I am planning on cleaning that mess up))