I currently have a 200 amp service coming into the house on the far south end (farthest point from the garage possible). The electricians filled the main box (I believe a 50 slot) near capacity leaving only 2 open lugs. I am going to install a 100 amp sub panel this fall that will immediately be used to run a 220 to the garage for a compressor and an additional oven in the basement used when we are having large gatherings. In the future this panel will also be used when we finish part of the basement.
My question is on location. Should I put the sub panel right next to the main service? I was thinking if I put the sub panel in a more central location it would simplify my wiring and possibly save me some money on wire when I do finish the basement.
My question is on location. Should I put the sub panel right next to the main service? I was thinking if I put the sub panel in a more central location it would simplify my wiring and possibly save me some money on wire when I do finish the basement.