I am putting a 12'x wide by 14' long shed up.
The picture shows dimensions and grade fall
Essentially the back end of the pad is about 2-3" below soil grade. I cannot go further back as there are massive tree roots there forming a wall.
I have exceptional drainage on the property.
My soil is very sandy with rocks and boulders everywhere. The pole barn beside the shop is a 32x32 single pour slab.
Foundation under the current existing 8x11.5 slab is just stone.
I have dug up and almost leveled the area, set up boards for the concrete form.
For the concrete:
1)Do I need to backfill with gravel, if none of the other structures or home which is slab on grade, use gravel underneath?
2)Should I isolate the new pad from the old via some 1/2" foam so the slabs move independently?
3) should the new add on pad be sectioned in 2, to not make it an L shape
4) do I need rebar for this concrete pour
5)Back of current pad is 2-3" below grade. The front of the new add on pad is 6 inches above grade. What should I do about the back? I plan on offsetting the shed 6" from the back and the left side of the pad.
Lots of questions, let me know your thoughts please and thank you.
The picture shows dimensions and grade fall
Essentially the back end of the pad is about 2-3" below soil grade. I cannot go further back as there are massive tree roots there forming a wall.
I have exceptional drainage on the property.
My soil is very sandy with rocks and boulders everywhere. The pole barn beside the shop is a 32x32 single pour slab.
Foundation under the current existing 8x11.5 slab is just stone.
I have dug up and almost leveled the area, set up boards for the concrete form.
For the concrete:
1)Do I need to backfill with gravel, if none of the other structures or home which is slab on grade, use gravel underneath?
2)Should I isolate the new pad from the old via some 1/2" foam so the slabs move independently?
3) should the new add on pad be sectioned in 2, to not make it an L shape
4) do I need rebar for this concrete pour
5)Back of current pad is 2-3" below grade. The front of the new add on pad is 6 inches above grade. What should I do about the back? I plan on offsetting the shed 6" from the back and the left side of the pad.
Lots of questions, let me know your thoughts please and thank you.