iagsxr
Well-known member
This has been a really drawn out process so I've been reluctant to start a thread. Things are starting to pick up so...
I've had a 30' x 60' pole building with no insulation or plumbing. Adding on 36' x 48'. This will house my business and be my shop. Two offices and a bathroom in the west end of the existing building. Inventory storage in the remaining space. The addition will be my loading/unloading bay for my business and my toy shop.
Way back in June they came and did the grade work for the addition;
The neighbor's garage is on my lot. Not sure what I'm going to do here to hold grade.
Had to take some of the concrete out of the existing building. Those overhead doors aren't going to be there anymore;
Initially rented an electric jackhammer. Ended up with a skiddy w/a breaker;
This last chunk was terrible;
The existing posts are coming out. There'll be a 12' overhead and a walk door between the two halves;
Got the grade work done then realized the gas service didn't come in where I thought it did. Had to wait a month for the gas company to come and retire that line. See that yellow line in the pic? Ooops
Once the gas line and concrete was out of the way builders came and set pole bases. This was August;
The offices are going to be in the West end of the existing building. I wanted a porch. It's a little narrow but we're encroaching on the right of way.
I've had a 30' x 60' pole building with no insulation or plumbing. Adding on 36' x 48'. This will house my business and be my shop. Two offices and a bathroom in the west end of the existing building. Inventory storage in the remaining space. The addition will be my loading/unloading bay for my business and my toy shop.
Way back in June they came and did the grade work for the addition;
The neighbor's garage is on my lot. Not sure what I'm going to do here to hold grade.
Had to take some of the concrete out of the existing building. Those overhead doors aren't going to be there anymore;
Initially rented an electric jackhammer. Ended up with a skiddy w/a breaker;
This last chunk was terrible;
The existing posts are coming out. There'll be a 12' overhead and a walk door between the two halves;
Got the grade work done then realized the gas service didn't come in where I thought it did. Had to wait a month for the gas company to come and retire that line. See that yellow line in the pic? Ooops
Once the gas line and concrete was out of the way builders came and set pole bases. This was August;
The offices are going to be in the West end of the existing building. I wanted a porch. It's a little narrow but we're encroaching on the right of way.
Last edited: