duwem
Well-known member
Saw a video on U tube where before pouring concrete they put down plastic sheet, taped the joints with that red insulation tape, then put 4x8' foam board on top of that with no tape at the joints, then the in floor heat pipes.
Is this common, or do most just tape the joints of the foam?
Is this common, or do most just tape the joints of the foam?
Last edited: