Innovate1
Well-known member
I need to ask some local people if this is enforced but thought I would get some general input here...
My plans have a detail "Continuous Air Barrier Detail" that shows caulking of the drywall to the plates, plates to the floor, etc. It also has a note "Electrical boxes caulked, glued, or gasketed to gyp board, caulk @ wire holes and penetrations."
How is this normally done? I know that boxes with flanges and gaskets are available but I have only seen them on line and doubt they are used much. What's the easiest/cost effective way to do this (if I have to do it)?
My plans have a detail "Continuous Air Barrier Detail" that shows caulking of the drywall to the plates, plates to the floor, etc. It also has a note "Electrical boxes caulked, glued, or gasketed to gyp board, caulk @ wire holes and penetrations."
How is this normally done? I know that boxes with flanges and gaskets are available but I have only seen them on line and doubt they are used much. What's the easiest/cost effective way to do this (if I have to do it)?
Last edited: