Figured I would go ahead and start a new build thread, even though it may go kind of slow.
Location: Fairbanks
40x50x 14
4/12 pitch (shingles)
2x8 construction
T-1 11 siding
French Barrel Drain (holding tank water system)
Monitor heater/woodstove/ and furnace. Yes I know that is very redundant
5" monolithic slab/ rebar
2 each 12x12 overhead doors
Currently waiting on the estimates to come in for the dirt/foundation work, but have prices for main part of the budget. Have a 12x28 shed to knock down first, and some trees to drop. That is part of the plan for this long weekend. Will take pictures along the way.
Location: Fairbanks
40x50x 14
4/12 pitch (shingles)
2x8 construction
T-1 11 siding
French Barrel Drain (holding tank water system)
Monitor heater/woodstove/ and furnace. Yes I know that is very redundant
5" monolithic slab/ rebar
2 each 12x12 overhead doors
Currently waiting on the estimates to come in for the dirt/foundation work, but have prices for main part of the budget. Have a 12x28 shed to knock down first, and some trees to drop. That is part of the plan for this long weekend. Will take pictures along the way.
Last edited: