Hi All,
I'm getting ready to pull the permit for my new garage.
Below are a bunch of pictures of the 3D mock up I did based on the plans.
This garage is being added to my property, about 100' away from my existing house. The funky two-tier roof is to achieve two goals: 1) match the look of the house 2) leave enough headroom in one bay for a 4-post auto lift without driving up the whole roof line.
The garage is 28' deep, and 26' wide. The tall bay will have a ceiling height of 13' on the outside wall and go up to 19.5' at the middle (6/12 roof). The short bay will start at 10' on the outside all and go up to 16.5' at the middle. There would be a post right in the middle supporting the ridge beam.
The plans have already been drawn by the architect and engineered by the PE. Before I pull the permit, I keep asking myself if I'm going to regret that big post in the middle. The ridge beam is currently a 6x14, and removing the post in the middle would likely drive it up to an 18" LVL or something massive along those lines. It's going to cost me ~$200 to have the engineer do the change, and the architect estimates ~ $300 to ~$500 for the bigger ridge beam.
The intent is to have a comfortable working environment and lots of storage. I've never had a garage with a post in the middle before.
What do you think? Will I regret that post? (Pics below)
Thanks,
Max
----------------------------------------------------------------------------------
----------------------------------------------------------------------------------
----------------------------------------------------------------------------------
----------------------------------------------------------------------------------
----------------------------------------------------------------------------------
----------------------------------------------------------------------------------
----------------------------------------------------------------------------------
----------------------------------------------------------------------------------
----------------------------------------------------------------------------------
I'm getting ready to pull the permit for my new garage.
Below are a bunch of pictures of the 3D mock up I did based on the plans.
This garage is being added to my property, about 100' away from my existing house. The funky two-tier roof is to achieve two goals: 1) match the look of the house 2) leave enough headroom in one bay for a 4-post auto lift without driving up the whole roof line.
The garage is 28' deep, and 26' wide. The tall bay will have a ceiling height of 13' on the outside wall and go up to 19.5' at the middle (6/12 roof). The short bay will start at 10' on the outside all and go up to 16.5' at the middle. There would be a post right in the middle supporting the ridge beam.
The plans have already been drawn by the architect and engineered by the PE. Before I pull the permit, I keep asking myself if I'm going to regret that big post in the middle. The ridge beam is currently a 6x14, and removing the post in the middle would likely drive it up to an 18" LVL or something massive along those lines. It's going to cost me ~$200 to have the engineer do the change, and the architect estimates ~ $300 to ~$500 for the bigger ridge beam.
The intent is to have a comfortable working environment and lots of storage. I've never had a garage with a post in the middle before.
What do you think? Will I regret that post? (Pics below)
Thanks,
Max
----------------------------------------------------------------------------------
----------------------------------------------------------------------------------
----------------------------------------------------------------------------------
----------------------------------------------------------------------------------
----------------------------------------------------------------------------------
----------------------------------------------------------------------------------
----------------------------------------------------------------------------------
----------------------------------------------------------------------------------
----------------------------------------------------------------------------------