wedge40
Well-known member
Got a basic shell up. 40'x56'x12' Contracted a cement guy to come on finish the leveling, dig a few trenches for drain and such, put down gravel, plastic, foam board, rebar and pex. Then pour about 45 yards of cement.
My worry is laying out the pex. When I started this almost two months ago it was getting in the 70's during the day, now some of the days are barely 50. If we start with 30 degree temps should I be worried about the pex cracking or not sealing properly? I thought about bringing the pex inside, but once brought outside it'll be cold in 20-30 minutes anyhow.
Wedge
My worry is laying out the pex. When I started this almost two months ago it was getting in the 70's during the day, now some of the days are barely 50. If we start with 30 degree temps should I be worried about the pex cracking or not sealing properly? I thought about bringing the pex inside, but once brought outside it'll be cold in 20-30 minutes anyhow.