jake00
Well-known member
At work we've got an over hang on the side of one of the buildings. We're thinking about erecting some pallet rack under it. What do we use as a base? Right now there's some recycled asphalt on the ground
Rack would be 12ft tall 28ft long 42" wide.
I was thinking of lagging it to some 4x6's. Or just setting it on the ground, Or some sort of concrete footing (frost level?). Or the sona tubes? We could tie it to the building
Heaviest thing on it would be our snowplow. Cardboard bales, empty pallets,
Rack would be 12ft tall 28ft long 42" wide.
I was thinking of lagging it to some 4x6's. Or just setting it on the ground, Or some sort of concrete footing (frost level?). Or the sona tubes? We could tie it to the building
Heaviest thing on it would be our snowplow. Cardboard bales, empty pallets,