Wondering what the height is of the main ceiling and how much more height you gained with the coffer trusses? Looking great!
thanks
 
To avoid these ads, REGISTER NOW!
OP
W

wickdgt

Well-known member
Joined
Jan 10, 2008
Messages
82
Wondering what the height is of the main ceiling and how much more height you gained with the coffer trusses? Looking great!
thanks

Once the OSB is put on the main ceiling will be 10' exactly, and the one in the middle will be 13' 8 1/2" for the two post lift.


Edgar
 
OP
W

wickdgt

Well-known member
Joined
Jan 10, 2008
Messages
82
Insulation is completed, vinyl and bricks going on, OSB is already been started inside. Soon this will be done.

Edgar
 

Attachments

  • 20160816_183350.jpg
    20160816_183350.jpg
    65.8 KB · Views: 266
  • 20160816_192513.jpg
    20160816_192513.jpg
    101.7 KB · Views: 249
  • 20160816_191806.jpg
    20160816_191806.jpg
    120.3 KB · Views: 320
  • 20160816_191738.jpg
    20160816_191738.jpg
    144 KB · Views: 305
  • 20160816_183504.jpg
    20160816_183504.jpg
    57.7 KB · Views: 263
  • 20160816_183435.jpg
    20160816_183435.jpg
    74 KB · Views: 303
  • 20160816_183404.jpg
    20160816_183404.jpg
    67 KB · Views: 270
OP
W

wickdgt

Well-known member
Joined
Jan 10, 2008
Messages
82
So the OSB is almost done on the ceiling. The roll up doors are in. The only thing I don't like is that the contractor did not boxed the outside ceiling bay area to fit the doors. So the OSB had to be cut to make space and I don't like how I can see the foam, it just not my thing. When the contractor comes by, I'm not letting this terrible finish of the OSB and not covered behind the roll of the doors uncovered. It is always something. Back wall is completed with the bricks, Alabama power came by and marked the area where the pole is going to be and mark where is going to be dig for the under ground conduit.

Edgar
 

Attachments

  • 20160818_190233.jpg
    20160818_190233.jpg
    93.7 KB · Views: 257
  • 20160818_190200.jpg
    20160818_190200.jpg
    102 KB · Views: 283
  • 20160818_190142.jpg
    20160818_190142.jpg
    98.1 KB · Views: 306
  • 20160818_182800.jpg
    20160818_182800.jpg
    137.1 KB · Views: 273
  • 20160818_174439.jpg
    20160818_174439.jpg
    105.4 KB · Views: 278
  • 20160818_174338.jpg
    20160818_174338.jpg
    105 KB · Views: 311
  • 20160818_174318.jpg
    20160818_174318.jpg
    78.9 KB · Views: 277
OP
W

wickdgt

Well-known member
Joined
Jan 10, 2008
Messages
82
Garage doors completed and closed, they look great. Beside the other issue.

Edgar
 

Attachments

  • 20160818_191834.jpg
    20160818_191834.jpg
    127.5 KB · Views: 230
  • 20160818_191826.jpg
    20160818_191826.jpg
    132 KB · Views: 286
OP
W

wickdgt

Well-known member
Joined
Jan 10, 2008
Messages
82
The OSB inside is done. Electrician and the dry wall workers will be here to finish the Man Cave some time tomorrow.
 

Attachments

  • 20160821_174821.jpg
    20160821_174821.jpg
    33.7 KB · Views: 168
  • 20160821_175002.jpg
    20160821_175002.jpg
    83.4 KB · Views: 173
  • 20160821_174854.jpg
    20160821_174854.jpg
    85.7 KB · Views: 189
OP
W

wickdgt

Well-known member
Joined
Jan 10, 2008
Messages
82
Well getting closer, all lights are installed. They are LED's. Fans done and the office too. Sanding drywall is done. Now bathroom sink, toilet and light fixture. Outside wall almost done then the three columns between the doors more bricks and that will be it. Then the punch out things that are needed to be take care off. Like fixing cement floor, too many rough areas and air pockets plus chunk of cements have come off. All power is hooked and ready for electric company to do the underground conduit. And plumbing to be finish.

Edgar
 

Attachments

  • 20160824_160337.jpg
    20160824_160337.jpg
    111.1 KB · Views: 195
  • 20160824_160355.jpg
    20160824_160355.jpg
    100.6 KB · Views: 218
  • 20160824_161106.jpg
    20160824_161106.jpg
    97.2 KB · Views: 246
  • 20160824_191655.jpg
    20160824_191655.jpg
    116.4 KB · Views: 218
  • 20160824_191723.jpg
    20160824_191723.jpg
    120.6 KB · Views: 219
  • 20160824_191810.jpg
    20160824_191810.jpg
    84.5 KB · Views: 224
  • 20160824_191842.jpg
    20160824_191842.jpg
    89.7 KB · Views: 211
OP
W

wickdgt

Well-known member
Joined
Jan 10, 2008
Messages
82
Two more pictures.
 

Attachments

  • 20160824_160311.jpg
    20160824_160311.jpg
    112.8 KB · Views: 154
  • 20160824_160241.jpg
    20160824_160241.jpg
    51.1 KB · Views: 163
OP
W

wickdgt

Well-known member
Joined
Jan 10, 2008
Messages
82
More progress. Tomorrow drive way will be poured.
 

Attachments

  • 20160825_194937.jpg
    20160825_194937.jpg
    87.1 KB · Views: 139
  • 20160825_192857.jpg
    20160825_192857.jpg
    111 KB · Views: 159
  • 20160825_192759.jpg
    20160825_192759.jpg
    106.6 KB · Views: 139
OP
W

wickdgt

Well-known member
Joined
Jan 10, 2008
Messages
82
Driveway been poured almost done, can't wait.


Edgar
 

Attachments

  • 20160826_125730.jpg
    20160826_125730.jpg
    65.5 KB · Views: 225
  • 20160826_125818.jpg
    20160826_125818.jpg
    58.7 KB · Views: 200

langsbr

Member
Joined
May 5, 2012
Messages
7
Looks good! Did you use open or closed cell foam? What was the R value for walls and roof deck?
 
OP
W

wickdgt

Well-known member
Joined
Jan 10, 2008
Messages
82
Sewer, water and Electrical all hooked up. Check the LED lights man it really brightens that shop. Outside security likes working like a champ. Almost to close out and give me my keys. LOL

Edgar
 

Attachments

  • 20160831_195052.jpg
    20160831_195052.jpg
    79 KB · Views: 284
  • 20160831_194907.jpg
    20160831_194907.jpg
    81.2 KB · Views: 266
  • 20160831_183806.jpg
    20160831_183806.jpg
    92.7 KB · Views: 258
  • 20160831_183723.jpg
    20160831_183723.jpg
    95.1 KB · Views: 273
  • 20160831_183714.jpg
    20160831_183714.jpg
    90.3 KB · Views: 318
  • 20160830_184919.jpg
    20160830_184919.jpg
    135.8 KB · Views: 242
OP
W

wickdgt

Well-known member
Joined
Jan 10, 2008
Messages
82
The shop is done. Now is to paint inside. Landscape is coming along great, what an improvement, love it. Now a company, gave me a quote to paint my floor shop. Nothing ordinary, just gray color with the flakes and industrial sealer etc. This guy quote me $13,400.00!!! Can you imagine if I would of ask for a more a type show floor?? Ouch, I guess I'll be doing it myself or leave the floor bare. Damn that's high.


Edgar

Oh more pictures to come.
 
Last edited:
To avoid these ads, REGISTER NOW!
OP
W

wickdgt

Well-known member
Joined
Jan 10, 2008
Messages
82
So he ask me what will be on my budget. I said that I was quoted by another company 3,600.00 and could go up to 4k. His replied, " I have more than 4 k on materials" end of quote. Holly heck he should using some type of out this world materials I guess.
Edgar
 
OP
W

wickdgt

Well-known member
Joined
Jan 10, 2008
Messages
82
So yesterday contractor and I closed out. My shop is done. Here are couple of pictures of the front, the landscaping work. Should be done today with the landscaping. Friday shop is getting started to paint it completely inside. Here are a few pictures:


Edgar
 

Attachments

  • 20160909_152821.jpg
    20160909_152821.jpg
    129.1 KB · Views: 336
  • 20160912_133221.jpg
    20160912_133221.jpg
    91 KB · Views: 306
  • 20160913_172641.jpg
    20160913_172641.jpg
    110.3 KB · Views: 354
  • 20160913_172706.jpg
    20160913_172706.jpg
    113.3 KB · Views: 306

jhark123

Well-known member
Joined
Jun 4, 2014
Messages
66
The 4k on materials is a lie unless he is using a really obscure, expensive product and putting on 4 coats. Doubtfull.
 
OP
W

wickdgt

Well-known member
Joined
Jan 10, 2008
Messages
82
Landscaping is done. Painting started. The picture shows the primer. The paint is going to be the same. The ceiling will have a lighter grey color. The window trims will have the lighter grey color like on the ceiling to break the monotony. Probably will paint a 6" stripe 4ft from the floor all around the shop. Check it out. Thanks for the compliments.

Edgar
 

Attachments

  • 20160916_145956.jpg
    20160916_145956.jpg
    82.7 KB · Views: 311
  • 20160916_145943.jpg
    20160916_145943.jpg
    87.5 KB · Views: 309
  • 20160917_110645.jpg
    20160917_110645.jpg
    125 KB · Views: 231
  • 20160917_110640.jpg
    20160917_110640.jpg
    123 KB · Views: 255
OP
W

wickdgt

Well-known member
Joined
Jan 10, 2008
Messages
82
And the shop paint is finish inside and the office. It came out pretty good even though imperfections can be seen of the OSB. Oh well I think it looks awesome. Next, the floor and then get my toys in there. Oh and got to give the Wife a big thank you, she is the one who push to get my shop done. She is awesome.


Edgar
 

Attachments

  • 20160921_191652.jpg
    20160921_191652.jpg
    62.7 KB · Views: 330
  • 20160921_191712.jpg
    20160921_191712.jpg
    63.3 KB · Views: 309
  • 20160921_191717.jpg
    20160921_191717.jpg
    60.6 KB · Views: 323
  • 20160921_191751.jpg
    20160921_191751.jpg
    71 KB · Views: 324
OP
W

wickdgt

Well-known member
Joined
Jan 10, 2008
Messages
82
So the shop is done. Waiting on the floor to dry and cure. Here are pictures. Once was painted, it was too slick so the floor contractor decided to foe it. So it has grip and it looks pretty good instead of plain grey color. Here are a couple of pictures.
 

Attachments

  • 20161014_084405.jpg
    20161014_084405.jpg
    66.9 KB · Views: 216
  • 20161013_160007.jpg
    20161013_160007.jpg
    70.2 KB · Views: 224
  • 20161013_155958.jpg
    20161013_155958.jpg
    76.7 KB · Views: 245
  • 20161013_155353.jpg
    20161013_155353.jpg
    83.4 KB · Views: 257
  • 20161013_074007.jpg
    20161013_074007.jpg
    52.5 KB · Views: 243
  • 20161013_073938.jpg
    20161013_073938.jpg
    56.6 KB · Views: 258
  • 20161011_120739.jpg
    20161011_120739.jpg
    75.5 KB · Views: 259
OP
W

wickdgt

Well-known member
Joined
Jan 10, 2008
Messages
82
So I started to bring my stuff from my house garage and my back shed. Slowing moving things in the shop. Just installed the Tire Loaf. Still have more to go.
 

Attachments

  • 20161031_194845.jpg
    20161031_194845.jpg
    74.6 KB · Views: 335
  • 20161031_194848.jpg
    20161031_194848.jpg
    67.8 KB · Views: 304
  • 20161031_194939.jpg
    20161031_194939.jpg
    67.6 KB · Views: 304
To avoid these ads, REGISTER NOW!
Top Bottom