But at least it's not another "My contractor screwed up my slab" question!
Pouring a small sidewalk, maybe 16' total length. From the deck to garage door. Will be done with bags.
My question can I use 4X's for the forms and leave them in? I would then stain them the color of the deck. Sorta like picture framing each section.
My concern is the concrete expanding/contracting. Would it expand enough to crack the slabs since there will be no room for it to expand to with the 4X's being non moveable? Only doing this for aesthetic reasons. Thought it would look nice.
If that shouldn't be done I'll just use the normal 2X4's for the forms and then remove them. Which leaves another question...I'll be doing this in sections as I can't mix the bags fast enough to do all at once. Can each section just **** up to one another, or should there be something in between them?
Thanks!
Pouring a small sidewalk, maybe 16' total length. From the deck to garage door. Will be done with bags.
My question can I use 4X's for the forms and leave them in? I would then stain them the color of the deck. Sorta like picture framing each section.
My concern is the concrete expanding/contracting. Would it expand enough to crack the slabs since there will be no room for it to expand to with the 4X's being non moveable? Only doing this for aesthetic reasons. Thought it would look nice.
If that shouldn't be done I'll just use the normal 2X4's for the forms and then remove them. Which leaves another question...I'll be doing this in sections as I can't mix the bags fast enough to do all at once. Can each section just **** up to one another, or should there be something in between them?
Thanks!