I found out that an interlock is not made for my specific cutler hammer 200 amp box. So I'll need a transfer switch and a sub panel. Any idea what a ballpark estimate would be in cost between having an electrician install an automatic transfer switch versus manual? What about just the part cost?
Thx
Thx