dave67fd
Well-known member
Just need a couple of clarifications on the following:
1) How have you all connected single wall pipe to B double wall pipe? If sheet metal screws, do you drill clearance holes in the outer pipe or just drill through both? or does it really matter?
2) The specification that the vent needs to be 4' minimum from a window, door ect.. can i assume this is 4' horizontally as well as 4' vertically?
Thanks for any input you guys can provide.
Dave
1) How have you all connected single wall pipe to B double wall pipe? If sheet metal screws, do you drill clearance holes in the outer pipe or just drill through both? or does it really matter?
2) The specification that the vent needs to be 4' minimum from a window, door ect.. can i assume this is 4' horizontally as well as 4' vertically?
Thanks for any input you guys can provide.
Dave
