chopperman
Member
- Joined
- Oct 21, 2008
- Messages
- 5
I'm using the rustoleum pro and have begun prepping. My problem is storage of shop equipment over the time periods needed for this project ( just don't have the space and it's not going out front unsupervised ), so I moved all my stuff to the right side and had planned prepping and finishing the left, then once cured I would tape off the left with poly and gorilla tape and work on the right ?
I was going to overlap the center by a few inches or so, anyone see any issues with this ?
Thanks
I was going to overlap the center by a few inches or so, anyone see any issues with this ?
Thanks