tldr;
I do want to move my server rack to the shop eventually - and free up the extra bedroom completely - but I have to build the enclosed mezzanine space first. No sense dragging computer equipment out there now to suffer the temperature swings and filth.
I do want to move my server rack to the shop eventually - and free up the extra bedroom completely - but I have to build the enclosed mezzanine space first. No sense dragging computer equipment out there now to suffer the temperature swings and filth.






