w33b8t1
Well-known member
I have a mat down now, but I kind of want to epoxy under it when it gets a bit warmer out.
I was thinking of epoxying along the shelf line on the left from the front to the back and not getting under there.
Anyone do something similar or is it an all or none thing? The problem is the tube rack and shelving really isn't easily mobile anyway.
On the other little bench legs can I just epoxy around them, wait for it to dry then jack up the leg and epoxy under the leg at a later date?
I was thinking of epoxying along the shelf line on the left from the front to the back and not getting under there.
Anyone do something similar or is it an all or none thing? The problem is the tube rack and shelving really isn't easily mobile anyway.
On the other little bench legs can I just epoxy around them, wait for it to dry then jack up the leg and epoxy under the leg at a later date?
Last edited:
