Well-known member
Finally making progress on my shop, getting ready for poly on the walls and ceiling over the next couple days.
Shop is 44x64 divided into 2 sections, a 24x44 section with a mezzanine, and a 40x44 section.
Just thinking if theres anything else i should do before sealing the walls up.
Already got power inside, i cut a sleeve in for a gasline, sleeves for the hydronic lines to heat the other bay, going to do 1 exhaust fan in each bay, ill leave that for the tin guys to cut in. Drilled in a hose bib today, going to do the plumbing vent eventually. Not sure if i should cut in some sort of a fresh air intake into the building, or just gamble on there being enough leakage around the overhead doors.
The boiler im using is mid efficient so it has the stainless steel exhaust through the wall, i need to cut the z vent wall thimble in.
Already got some exterior plugs shoved through the walls.
Shop is 44x64 divided into 2 sections, a 24x44 section with a mezzanine, and a 40x44 section.
Just thinking if theres anything else i should do before sealing the walls up.
Already got power inside, i cut a sleeve in for a gasline, sleeves for the hydronic lines to heat the other bay, going to do 1 exhaust fan in each bay, ill leave that for the tin guys to cut in. Drilled in a hose bib today, going to do the plumbing vent eventually. Not sure if i should cut in some sort of a fresh air intake into the building, or just gamble on there being enough leakage around the overhead doors.
The boiler im using is mid efficient so it has the stainless steel exhaust through the wall, i need to cut the z vent wall thimble in.
Already got some exterior plugs shoved through the walls.