Hi guys, I have the Armorpoxy 3 part system I'm about to install and just want to verify which product to use for the 2nd and 3rd coats. My instructions do not match the product I received so I want to be absolutely sure before laying it down and Armorpoxy is closed on the weekend.
I am laying down the Armorpoxy II today which is the prime coat (orange label).
Tomorrow comes the Armorultra high build epoxy which I believe is the product that comes with the gallon that is inside the 5 gallon buckets that you mix together at a 2:1 ratio - see picture #1.
Then I believe the final coat is the Armorultra Polyaspartic topcoat that is a 1:1 mix (Red label), however there are two small pints that came with them which are the pigment. The label on the pints says mix 1 pint per 2 gallons - see pictures #2 & 3.
Any insight would be greatly appreciated. Thanks!
I am laying down the Armorpoxy II today which is the prime coat (orange label).
Tomorrow comes the Armorultra high build epoxy which I believe is the product that comes with the gallon that is inside the 5 gallon buckets that you mix together at a 2:1 ratio - see picture #1.
Then I believe the final coat is the Armorultra Polyaspartic topcoat that is a 1:1 mix (Red label), however there are two small pints that came with them which are the pigment. The label on the pints says mix 1 pint per 2 gallons - see pictures #2 & 3.
Any insight would be greatly appreciated. Thanks!
