nc.detail
Well-known member
I recently finished the third round for the garage floor.
1st - Armorpoxy ArmorClad w/ partial flake and military topcoat (yellowed after a couple years in main garage, separate garage still looks great)
2nd - Swisstrax - pearl silver and pearl gray (unable to keep the garage as clean as I'd like)
3rd - Armorpoxy
4.5 gals ArmorUltra light gray epoxy for the base
80lbs lanai gray flake
6 gals Ultrafast Polyaspartic Clear
The reason for removing the tiles - I strugged with the Swisstrax from the beginning as I wasn't able to keep the garage as clean as I'd like without removing the tiles for a deep clean. I tried vacuuming, surface cleaners, pressure washing, etc. but there's no real way to scrub the floor without pulling the tiles up. I detail part-time and polish 2-3 cars a month.
Apr '22 - I've finally started mid-March to prep the floor for a redo. Armorpoxy staff (Arthur & Laurie) were super helpful along the way and after three phone calls I finally placed the order. My wife acted as a good helper and it took us three consecutive days to get all the materials down.






1st - Armorpoxy ArmorClad w/ partial flake and military topcoat (yellowed after a couple years in main garage, separate garage still looks great)
2nd - Swisstrax - pearl silver and pearl gray (unable to keep the garage as clean as I'd like)
3rd - Armorpoxy
4.5 gals ArmorUltra light gray epoxy for the base
80lbs lanai gray flake
6 gals Ultrafast Polyaspartic Clear
The reason for removing the tiles - I strugged with the Swisstrax from the beginning as I wasn't able to keep the garage as clean as I'd like without removing the tiles for a deep clean. I tried vacuuming, surface cleaners, pressure washing, etc. but there's no real way to scrub the floor without pulling the tiles up. I detail part-time and polish 2-3 cars a month.
Apr '22 - I've finally started mid-March to prep the floor for a redo. Armorpoxy staff (Arthur & Laurie) were super helpful along the way and after three phone calls I finally placed the order. My wife acted as a good helper and it took us three consecutive days to get all the materials down.






