Attached garage remodel 11x24

dennis3553

Member
Joined
Sep 22, 2016
Messages
20
This is my 3rd year in the house. Just a regular attached single car garage that needed some work. Floor was badly pitted and uneven. It was poured by hand in the early 50's. The garage is 11.5 x 24. So this is what we did and some pictures.
Jack hammered the old floor out along with ripping out old black top driveway and 2 walk ways.
replaced the dry wall on the ceiling and some on the walls.
put in new doors and a new window.
Paint (Harley colors).
new outlets, switches, led shop lights and a 20 amp line and plug for my compressor
just need to add my air compressor and get my Harley back in after the floor sets in a few weeks.
All the prep work for the concrete was done by myself, my wife and father in law. Then i hired some finishers to pour and finish. drive way is 20.5 x 100 total of 36 yards poured in 1 day.
Garage floor is 7 inches thick.
 

Attachments

  • Resized_20161016_193951.jpg
    Resized_20161016_193951.jpg
    10.9 KB · Views: 46
  • Resized_20160918_160114_resized.jpg
    Resized_20160918_160114_resized.jpg
    19.8 KB · Views: 38
  • Resized_20161013_183510_resized.jpg
    Resized_20161013_183510_resized.jpg
    10.3 KB · Views: 37
  • Resized_20160921_182229.jpg
    Resized_20160921_182229.jpg
    18.7 KB · Views: 36
  • Resized_20160918_160031.jpg
    Resized_20160918_160031.jpg
    26.3 KB · Views: 31
  • 20161008_172129_resized.jpg
    20161008_172129_resized.jpg
    142.8 KB · Views: 36
To avoid these ads, REGISTER NOW!

Zeke

Well-known member
Joined
Aug 13, 2009
Messages
17,176
Location
Long Beach CA, the sewer by the sea.
This is my 3rd year in the house. Just a regular attached single car garage that needed some work. Floor was badly pitted and uneven. It was poured by hand in the early 50's. The garage is 11.5 x 24. So this is what we did and some pictures.
Jack hammered the old floor out along with ripping out old black top driveway and 2 walk ways.
replaced the dry wall on the ceiling and some on the walls.
put in new doors and a new window.
Paint (Harley colors).
new outlets, switches, led shop lights and a 20 amp line and plug for my compressor
just need to add my air compressor and get my Harley back in after the floor sets in a few weeks.
All the prep work for the concrete was done by myself, my wife and father in law. Then i hired some finishers to pour and finish. drive way is 20.5 x 100 total of 36 yards poured in 1 day.
Garage floor is 7 inches thick.

Must be a heavy Harley! Nice work.
 
To avoid these ads, REGISTER NOW!
OP
D

dennis3553

Member
Joined
Sep 22, 2016
Messages
20
Must be a heavy Harley! Nice work.

i decided last minute i wanted it poured to the top of the concrete blocks on the bottom of the footer. And i got a good price on the concrete so i went with it.
 