Approximately 8 months ago I finished a complete overhaul on my basement. This involved some new plumbing and electrical work, new paint and most importantly an epoxy floor. I waited for several months before posting so that I could get a feel for how well it would hold up and how bad the mistakes I made would really affect the project. This thread will mostly be about the floor.
The whole goal of the project was to make the basement habitable and functional without spending a ton of cash. It was an extensive project and I learned a ton. I would mostly do everything the same way but with some minor tweaks here and there that would probably make a huge difference in the finished product, which I will share as this thread progresses. The first tip is to not do this when your wife is pregnant and you live in a 900sqft house where the laundry, and most everything is stored in the basement.
So, to start with this is what things looked like before I began. The view from the top of the stairs looking down. YIKES!

And some shots of the floor, which was some type of floor paint/epoxy that was wearing off badly.


The floor drain where the A/C and humidifier drained. NASTY!

Some awesome color choices on the wall by the previous owner. I guess they couldn't decide if the mustard yellow was nice enough to paint all the way around or perhaps the yellow was to expensive so they only put it in the important spot? You can also see the electrical boxes I added. When I started there was one outlet in the whole basement.

This was what the ceiling looked like before painting. Due its low height we couldn't do a drop ceiling. Plus, paint is much cheaper. Note the outlet and surround speaker wire hanging from the support column.

And finally everything moved to one side to start on half the floor. Because we used the basement so frequently we couldn't do it all at once. Plus, we had nowhere to store the stuff while it was being done except to shove it all on one side.

The whole goal of the project was to make the basement habitable and functional without spending a ton of cash. It was an extensive project and I learned a ton. I would mostly do everything the same way but with some minor tweaks here and there that would probably make a huge difference in the finished product, which I will share as this thread progresses. The first tip is to not do this when your wife is pregnant and you live in a 900sqft house where the laundry, and most everything is stored in the basement.

So, to start with this is what things looked like before I began. The view from the top of the stairs looking down. YIKES!

And some shots of the floor, which was some type of floor paint/epoxy that was wearing off badly.


The floor drain where the A/C and humidifier drained. NASTY!


Some awesome color choices on the wall by the previous owner. I guess they couldn't decide if the mustard yellow was nice enough to paint all the way around or perhaps the yellow was to expensive so they only put it in the important spot? You can also see the electrical boxes I added. When I started there was one outlet in the whole basement.

This was what the ceiling looked like before painting. Due its low height we couldn't do a drop ceiling. Plus, paint is much cheaper. Note the outlet and surround speaker wire hanging from the support column.

And finally everything moved to one side to start on half the floor. Because we used the basement so frequently we couldn't do it all at once. Plus, we had nowhere to store the stuff while it was being done except to shove it all on one side.






There isn't a straight line or 90 degree angle to be found. The step heights varied from 6 1/2" to 8" but not one was the same. Not to mention the fine finish they put on the treads.

The first project is always a huge learning process now matter how much you read up on it. The second is much smoother..... What's next? 