I was going to use it as a fill in side. I have run rebar between all post horizonally. Drilled two holes (evenly spaced) a drove the rebar thru posts, dug two holes 2' down between posts. Formed posts on both sides and rear, mixed concrete and poured concrete between posts. Its about 4"-5" below grade. Ended up with about + - 40" fall front to rear.
Was going to get a triaxel load at a time.
Thanks for all the replys to my post. It will take me awhile to get back on this sight. I do HVAC install/repair and at night installing new system at house across from me. They lost their house in last years tornado. Happy New To All