Yet another foundation question. I have a dilemma I’m trying to figure out. I have a stepped footer on grade. 3 blocks on the high side, 8 blocks high on the lowest corner. 8” block is doweled every 3 feet 6” into footer (high strength epoxy) and to the top course, and all cells of every block are filled to the top (3500 w/fiber). Total measurements are 24’x32’. No ladder wire was installed. I feel like we’re good to place 57 stone and pour, buddy says I need brick the foundation and backfill outside before we backfill slab. Is this really necessary?