In DOT work, we use what is called granular backfill, which sometimes means a coarse sand or fine gravel, depending on the location and available aggregates. Prices will vary, largely based on distance from the rock pits. But on average, $10-15/ton is a good number.
From the concrete plant, we have a mix called CLSM which is a lower strength concrete. It is still running $60-70/cy delivered.
FYI....
CLSM = 60' x 36' x 2' = 160cy x $65 (average) = $10,400
Granular Backfill (or other aggregate material) = 160cy x 2#/cy (ballpark) = 320 tons x $12.50 (average) = $4,000