I'm prepping a basekment floor for a 100% solids epoxy and I have a quick question. It is a small area (100 sq. ft laundry/utility room)and the concrete is smooth (power trowelled). There is a softer, hand troweled patch in the middle of it from some plumbing repairs (fine sand top-coat).
I have a 5" grinder with a cyclone coarse cup wheel that I'll be using to wet-grind the floor by hand. Renting a larger machine isn't an option because access is a big pain. Besides, it's a small area and projects like this build character.
Following grinding, my plan is to flood with detergent+water and use a stiff broom and vacuum to get up the trapped dust (power washing isn't an option).
Grinding + washing was the recommended prep by the manufacturer but I figure it is worth asking: Should I also acid wash the floor following this prep to ensure absorption/adhesion of the 1st coat?
Thanks.
I have a 5" grinder with a cyclone coarse cup wheel that I'll be using to wet-grind the floor by hand. Renting a larger machine isn't an option because access is a big pain. Besides, it's a small area and projects like this build character.
Following grinding, my plan is to flood with detergent+water and use a stiff broom and vacuum to get up the trapped dust (power washing isn't an option).
Grinding + washing was the recommended prep by the manufacturer but I figure it is worth asking: Should I also acid wash the floor following this prep to ensure absorption/adhesion of the 1st coat?
Thanks.