OP
Belgique Basterd
Well-known member
Vehicle weight will be carried by the lift runners. This means the floor does not have to be engineered to carry a lot of weight on it's full surface. I think heavy gauge "1.5 x 1.5" (40mm x 40mm ?) square tubing run crosswise on 16" (500 mm?) centers and topped with 20mm decking plywood would do the job.
When the lift is in the down position the top deck closes up the hole in the ground level house floor, that way the ground level garage can be used whenever the basement lift itself is not in use.
The hole measures 3.2 mtr wide/ 5.8 mtr long so quite a span, I was thinking some kind of plywood/steel honeycomb structure?

, as mentioned in previous posts I was able to buy this lift rather cheap. Extra high lifts don't come by often on the second hand market here and to buy them new they are ridiculously expensive for a hobby garage like mine.
