View of the "L" containing the future office/hang out portion of the Garage.
012.jpg
 
OP
M

mallen555

Well-known member
Joined
Oct 1, 2011
Messages
75
Siding is progressing well with Hardi Board and cedar shingles in the gables.
House Excavation 1 103.jpg
 
OP
M

mallen555

Well-known member
Joined
Oct 1, 2011
Messages
75
Driveway prep continued today but the paving date has been pushed back to next week....really hoping the weather cooperates as we're getting pretty late in the season with dry days getting fewer and further between...will keep fingers crossed!!
House Excavation 1 116.jpg
 
To avoid these ads, REGISTER NOW!
OP
M

mallen555

Well-known member
Joined
Oct 1, 2011
Messages
75
The 9' bay door left about an inch of clearance for the old camper van. Once inside, the bulb on top actually scraped along on the mechanical release. I plan to change out the 90 degree 'elbows' on the roller track so the doors with follow the plane of the ceiling. This will also allow a four post lift to be installed in the other bay.
[/ATTACH]
 

Attachments

  • House Excavation 1 029.jpg
    House Excavation 1 029.jpg
    147 KB · Views: 17
OP
M

mallen555

Well-known member
Joined
Oct 1, 2011
Messages
75
Waterbar/Berm built into the top of the drive to divert runoff into culvert.