Hi Everyone,
Long time reader, first time poster here....
I'm proud to say that after many years of planning I finally had a 50 x 80 pole barn put up last fall. 14' side walls with 2 12' doors on one side wall. Now that spring is starting to sprung in the great state of Wisconsin, it's time for me to think about getting that concrete poured....
My plan is vapor barrier, insulate the floor with 2" of XPS (4x8 sheets) and then have 5" of high PSI concrete poured with rebar and fiber mesh. I'm roughing in plumbing for a bath that may or may not ever happen, 1" water line for a future well, and 30' trough style drain in the center that will shoot out to grade per code.
I've ruled out radiant floor heating just due to my use case. I don't plan on being in there every day and perhaps at times a week or more due to work travel which BTW is very inconvient , work that is
HVAC will be forced air on LP so nothing below slab...
What else should I be considering? I think I have all my bases covered but just want to make sure given the permanence of concrete
I'm thinking about a two post rack down the road, should I have piers/footings put in now for support?
Thank you!
Jessup
Long time reader, first time poster here....
I'm proud to say that after many years of planning I finally had a 50 x 80 pole barn put up last fall. 14' side walls with 2 12' doors on one side wall. Now that spring is starting to sprung in the great state of Wisconsin, it's time for me to think about getting that concrete poured....
My plan is vapor barrier, insulate the floor with 2" of XPS (4x8 sheets) and then have 5" of high PSI concrete poured with rebar and fiber mesh. I'm roughing in plumbing for a bath that may or may not ever happen, 1" water line for a future well, and 30' trough style drain in the center that will shoot out to grade per code.
I've ruled out radiant floor heating just due to my use case. I don't plan on being in there every day and perhaps at times a week or more due to work travel which BTW is very inconvient , work that is
What else should I be considering? I think I have all my bases covered but just want to make sure given the permanence of concrete
I'm thinking about a two post rack down the road, should I have piers/footings put in now for support?
Thank you!
Jessup