My 30x50 Morton Building is scheduled to begin construction around the first week of May. I will be applying for my building permit within the next couple of weeks once Morton provides me with plans. Once I've got the permit approved, I will begin to clear and prep the site. What I do at this point can potentially save me lots of headaches and money down the road. What types of things should I be considering?
1. I will have radiant heat. So I know I'll want the foam under slab.
2. I plan to use a wood fired boiler outside to heat my floor. What should I run between outside and inside to do this? Do I need to insulate the runs to and from the boiler?
3. Drain. Just a 4" PVC pipe running out from under the slab? Or 2"? Plug up to it later?
4. Possible well in the future. What do I do for this? No idea.
5. For a 30x50, should I do expansion joints in my concrete inside and outside? I will have a 24x24 pad out front.
Any suggestions would be appreciated. It's the unthought of things that are worrying me right now. I'd rather put it in and not use it than want it later and have to deal with that.
Thanks!
1. I will have radiant heat. So I know I'll want the foam under slab.
2. I plan to use a wood fired boiler outside to heat my floor. What should I run between outside and inside to do this? Do I need to insulate the runs to and from the boiler?
3. Drain. Just a 4" PVC pipe running out from under the slab? Or 2"? Plug up to it later?
4. Possible well in the future. What do I do for this? No idea.
5. For a 30x50, should I do expansion joints in my concrete inside and outside? I will have a 24x24 pad out front.
Any suggestions would be appreciated. It's the unthought of things that are worrying me right now. I'd rather put it in and not use it than want it later and have to deal with that.
Thanks!