iagsxr
Well-known member
Had to reload my computer and lost all of my fabrication pics so this actually starts towards the end.
The frame is 1 1/2" 12 ga square tubing. The tabs are from A&A. Clamped a 6" channel to the forks of my forklift and clamped the tubing to the channel to fixture it. Had it powdercoated, which gets us to here;
Screwed to wall;
Plugs for screw holes;
Brace rods are 1/2" stainless. Drilled and tapped for 5/16" heims;
Stainless spacers;
Together;
W/butcherblock top from LL;
Need to build a backsplash and do something to protect the wall. Have a couple ideas, just letting them roll around in my head till I decide what's best.
The frame is 1 1/2" 12 ga square tubing. The tabs are from A&A. Clamped a 6" channel to the forks of my forklift and clamped the tubing to the channel to fixture it. Had it powdercoated, which gets us to here;
Screwed to wall;
Plugs for screw holes;
Brace rods are 1/2" stainless. Drilled and tapped for 5/16" heims;
Stainless spacers;
Together;
W/butcherblock top from LL;
Need to build a backsplash and do something to protect the wall. Have a couple ideas, just letting them roll around in my head till I decide what's best.