I would like to get some ideas on how to handle a portion of my garage build.
I am building a 24x48 garage with two 18x8 garage doors on 10 ft walls. I am using 4x14 laminated headers above the door openings. I have come to the point where it is time to start building the front wall (the back and sides are done and tilted into place)
What is the best way to build the front wall and install this very heavy header beam. I do not think I can build it laying down and tilt it up
Do I build the basic wall with out the header and then find a way to lift it. Is there anything out there that can be rented for a reasonable price to aid this process.
any suggestions would be great..
Here is a quick snap shot from the other day, its a little further along now
I am building a 24x48 garage with two 18x8 garage doors on 10 ft walls. I am using 4x14 laminated headers above the door openings. I have come to the point where it is time to start building the front wall (the back and sides are done and tilted into place)
What is the best way to build the front wall and install this very heavy header beam. I do not think I can build it laying down and tilt it up
Do I build the basic wall with out the header and then find a way to lift it. Is there anything out there that can be rented for a reasonable price to aid this process.
any suggestions would be great..
Here is a quick snap shot from the other day, its a little further along now
Last edited: