So much of what is shown here is old work, done 15 years ago, but because of a new garage bay that I added I am extending the black iron lines to areas they did not reach before.
New work branches left off the "T" coming up from the compressor. It was complicated by the fact that I have a feed line running across the ceiling from a regulator on the back wall. The ceiling line feeds a hose reel and the air release latches on my 4 post lift. The new line had to sit on extra depth stand offs to clear the ceiling to wall transition on the front wall. Also had to run it very near the ceiling to clear the big garage door sprint frame.
3/4 inch feed, and 1/2 drops with dryers and regulators. Quincy HD-5 compressor
Here is the feed from the compressor (which sits at the corner of front and side wall)
Here is the new work running over the garage tracks and 1/2 ceiling feed line.
The last new work showing the far end of the new run across the front wall of the garage. I still have to punch through the common wall and in to the new garage bay. The line will also take a turn down and head along the opposite side wall to the compressor.
Here is a shot of the old work showing the main line and hose real drop (TP Tools drop kits)
And lastly the back wall, where a common regular provides a tool drop, hose reel feed, and 4 post lift lock release drop
New work branches left off the "T" coming up from the compressor. It was complicated by the fact that I have a feed line running across the ceiling from a regulator on the back wall. The ceiling line feeds a hose reel and the air release latches on my 4 post lift. The new line had to sit on extra depth stand offs to clear the ceiling to wall transition on the front wall. Also had to run it very near the ceiling to clear the big garage door sprint frame.
3/4 inch feed, and 1/2 drops with dryers and regulators. Quincy HD-5 compressor
Here is the feed from the compressor (which sits at the corner of front and side wall)
Here is the new work running over the garage tracks and 1/2 ceiling feed line.
The last new work showing the far end of the new run across the front wall of the garage. I still have to punch through the common wall and in to the new garage bay. The line will also take a turn down and head along the opposite side wall to the compressor.
Here is a shot of the old work showing the main line and hose real drop (TP Tools drop kits)
And lastly the back wall, where a common regular provides a tool drop, hose reel feed, and 4 post lift lock release drop