wfopete
Well-known member
I have a contractor replacing the roofing to include trusses, on my house. I would say that quality for the work has been fair but the crew rarely puts in anything more than a 6 six-hour day. As far as the boss man goes, there is poor communication on a daily basis as to how the job is going and the crew does not appear to well equipped as they are using my saw horses, ladder, extension, cords etc. but are supplying their own tools (thankfully). Kind of makes me wonder. I'm not too familiar with the construction trade but I built a few things myself. I generally don't see the attention to detail given to the work that I would give.
Is there such a thing as a gratuity for a job well done and what would be some of the things I should look for that would or would not be deserving of a gratuity?
Is there such a thing as a gratuity for a job well done and what would be some of the things I should look for that would or would not be deserving of a gratuity?
Last edited:




