Hey Ya'll I'm BrotherBob and newly retired.

Time to build a shop for my toys and a little parking. This wont be a garage of distinction but a simple build.....poor man has got poor ways!

Foot print 40x56x14 one big door 14x14 opening will be 13'2".
One man door , two windows.

Pole barn all framed in wood, insulated, clad in metal.

Just started the contract to build, all in at 42k. Man says 3 weeks , I bet more like 6!

I'll get a picture up when the pad work starts.

BB
 
To avoid these ads, REGISTER NOW!

larry_g

Well-known member
Joined
Apr 28, 2007
Messages
16,930
Location
oregon
Welcome to the group. I'd suggest that you make a few more posts so that you can meet the minimum, 5, post count needed to post pictures. I find for me that it is easiest to make an album here to hold pictures and then in future they are here to link to again if needed. You can also refer people to your albums if necessary. here is one of my albums from the local tractor show. https://www.garagejournal.com/forum/album.php?albumid=5168

lg
no neat sig line
 
OP
B

brotherbob

Active member
Joined
Dec 1, 2005
Messages
28
Location
Tejas
Hey Ya'll I'm BrotherBob and newly retired.



Time to build a shop for my toys and a little parking. This wont be a garage of distinction but a simple build.....poor man has got poor ways!



Foot print 40x56x14 one big door 14x14 opening will be 13'2".

One man door , two windows.



Pole barn all framed in wood, insulated, clad in metal.



Just started the contract to build, all in at 42k. Man says 3 weeks , I bet more like 6!



I'll get a picture up when the pad work starts.



BB



That’s a Big Ten Four!
So can I just post here a few more times? I do have a updated pic to share!
BB


Sent from my iPhone using Tapatalk
 
OP
B

brotherbob

Active member
Joined
Dec 1, 2005
Messages
28
Location
Tejas
IMG_7670.jpg

The barn will blot out my neighbors place. So pad is getting built.


Sent from my iPhone using Tapatalk
 

el monte slim

Well-known member
Joined
Apr 4, 2018
Messages
243
Location
Midwest USA
IMG_7670.jpg

The barn will blot out my neighbors place. So pad is getting built.


Sent from my iPhone using Tapatalk

I've got a view of a neighbors house that I'd like to blot out with the erection of a large hobby shop. Sadly, the county just can't be convinced to let me to build one in the middle of the road in front of his house! No matter how obscure, imagine any possible piece of junk that you can, and it's probably laying somewhere in his yard.

Congrats on your recent retirement and your new building project. Best wishes for smooth running of both! :thumbup:
 
OP
B

brotherbob

Active member
Joined
Dec 1, 2005
Messages
28
Location
Tejas
Thanks all it’s my poor man version of a garage mahal .LOL
Not sure if a panorama pic will work? We are on the banks of the Brazos River.57377675502__135D12DC-70AE-4001-B0E6-B0B501B41828.jpg


Sent from my iPhone using Tapatalk
 
OP
B

brotherbob

Active member
Joined
Dec 1, 2005
Messages
28
Location
Tejas
I sure hope so, our old house /shop sold so fast I’m having to move out of it! We have a party shack I’ve got full of shop stuff.
Another part of the puzzle my Wife’s 1972 GMC Jimmy 2wd!
Had it tucked into the back of my old shop. I’m a couple of trailer loads from being moved out.
Updated pics of pad work and drive.
IMG_7683.jpg
IMG_7680.jpg


Sent from my iPhone using Tapatalk
 
OP
B

brotherbob

Active member
Joined
Dec 1, 2005
Messages
28
Location
Tejas
IMG_7688.jpg
Our 36’ RV in the pic will have this view from its new pad under cover.
IMG_7685.jpg
View of the build site , our home to the right. Brazos River below , we run a 450HP airboat in it.


Sent from my iPhone using Tapatalk
 
OP
B

brotherbob

Active member
Joined
Dec 1, 2005
Messages
28
Location
Tejas
So three weeks later ,,nothing happens....next week they say...


Sent from my iPhone using Tapatalk
 
OP
B

brotherbob

Active member
Joined
Dec 1, 2005
Messages
28
Location
Tejas
So we have progress. Truss’ delivery and schedule for a Friday morning build.4651e9ac50599deff29cd1621e4ab57b.jpg



Sent from my iPhone using Tapatalk
 

Attachments

  • 4651e9ac50599deff29cd1621e4ab57b.jpg
    4651e9ac50599deff29cd1621e4ab57b.jpg
    395.1 KB · Views: 0
OP
B

brotherbob

Active member
Joined
Dec 1, 2005
Messages
28
Location
Tejas
Well today is framing day!
9a19d9784c92d8254071e4ce0acea3c3.jpgIMG_7914.jpg
Bob
 

Attachments

  • IMG_7914.jpg
    IMG_7914.jpg
    135.3 KB · Views: 39
  • 9a19d9784c92d8254071e4ce0acea3c3.jpg
    9a19d9784c92d8254071e4ce0acea3c3.jpg
    383.4 KB · Views: 0
OP
B

brotherbob

Active member
Joined
Dec 1, 2005
Messages
28
Location
Tejas
Thanks , at least I know it doesn’t look like I built it! LOL!

We needed more dirt like 30 yards, oops.

b716c4984475d20427c54d82399b8bf6.jpg
 
OP
B

brotherbob

Active member
Joined
Dec 1, 2005
Messages
28
Location
Tejas
So we are close to the initial structure framed. We still have a 40’ carport down one side to do.
IMG_7940.jpg
 
To avoid these ads, REGISTER NOW!
OP
B

brotherbob

Active member
Joined
Dec 1, 2005
Messages
28
Location
Tejas
Interested in following this build and seeing if you recommend the builder you're using.



I’m a pretty easy going guy. I understand things take time, things change, weather is a factor etc.

It’s difficult to be tight lipped when it’s your money. However these guys were young and super hardworking knowledgeable guys.
Just ran out of daylight.

More rain forecast for the week.

It will get done , in time. I did order the Rustolem epoxy kits for the floor. Most indoor electric is bought. We ordered a four post lift to store cars, should be a couple of weeks out on that.
90aa5fd59780d605420abc0b8cd50bb6.jpg

I’ve asked the foreman to let me pay one of his guys to build a loft and some shelves for cash...we’ll see.
 
OP
B

brotherbob

Active member
Joined
Dec 1, 2005
Messages
28
Location
Tejas
Framing crew got rained out on another job. Maybe we finish framing today? Rain on the way!

Oh need more dirt ! 60 yards this time.

Making progress is good, they get a half way payment soon.

3714334744590f7b96157c99b4a71650.jpg
 
OP
B

brotherbob

Active member
Joined
Dec 1, 2005
Messages
28
Location
Tejas
Got most of it framed, concrete on Friday.
Did get a big storm hoping everything dries out.
IMG_7969.jpg
BB
 
OP
B

brotherbob

Active member
Joined
Dec 1, 2005
Messages
28
Location
Tejas
Today is concrete, finally finishing framing and walk through door,boxing windows.

Today will be s big day and a 17k day to be exact. That’s the halfway payment.

So did you sign your concrete? I think I wanna Homer Simpson in the concrete!
IMG_7972.jpg
Bob
 
OP
B

brotherbob

Active member
Joined
Dec 1, 2005
Messages
28
Location
Tejas
The RV spot gets a curb to hold the rock in place and prevent erosion.

The 40’ carport has to wait until the pour to get the concrete truck in place.

Plastic down , rebar in , 10” deep where the 4 post lift goes 6” every where else.

Ready to see the pad!IMG_7977.jpg
 
OP
B

brotherbob

Active member
Joined
Dec 1, 2005
Messages
28
Location
Tejas
We washed , etched and put down 4gallons of Rustomleum epoxy.
Looks good but thin and trashy.
Gonna wait until they are done then put down 2 more gallons, flake and then 3 gallons of clear epoxy.
No idea how long the next step takes , communication is not paramount on this project.

Guess I need to pay them and the next step happens.

Bob
 
OP
B

brotherbob

Active member
Joined
Dec 1, 2005
Messages
28
Location
Tejas
I love how close you put it to the neighbor lol. Looks like itll be a nice building!



The property line is 6’ away from the building. The ugly house is like 18” to 24” away from the line.

I’d love to buy that place and just clean off the 2.5 acres.

Now if I wanna really be a butthead I’ll mount my compressor right by that window, ha. JK

Bob
 
OP
B

brotherbob

Active member
Joined
Dec 1, 2005
Messages
28
Location
Tejas
Metal today...I think this is the six week mark today.

We should have a dry spot tonight?

Finish this week if the rain will stop for a day or two.
IMG_8080.jpg

Oh my Wife bought me a goodie for the shop to stack cars!
IMG_8654.jpg
 
OP
B

brotherbob

Active member
Joined
Dec 1, 2005
Messages
28
Location
Tejas
Update 6 weeks
6bf608eb9db28b3acd27fdbab78936ec.jpg
6b8cf0def6d364ed5d8a67e90dea0776.jpg

a416965ece4459db8391253f366ddbcf.jpg

So we are getting closer to the end of the contractors build!
Maybe a day or two?
Bob
 
OP
B

brotherbob

Active member
Joined
Dec 1, 2005
Messages
28
Location
Tejas
So all done except about 6’ of trim.
Took six weeks...ish
Happy to start the loft and lights etc.

IMG_8109.jpg
IMG_8106.jpg
120b228c7d98099a5aa52f97a6ed21b8.jpg
 
OP
B

brotherbob

Active member
Joined
Dec 1, 2005
Messages
28
Location
Tejas
57876989853__7291230F-0D66-4148-A8D8-C2A864EE0CC6.jpg
IMG_8130.jpg57876984798__11932502-FC82-4725-8219-422AC9C85547.jpg
And we are in! All electrical done by me. 41k all in said and done.
Hope you can learn something good or bad from it.