VietGnome
Well-known member
I was talking to my framer buddy about my garage plans, I mentioned cutting 4.5" off of studs to comply with 12' ceiling height, he said it will likely be 6".
Does that mean he's anticipating a bottom plates ontop of the sill plate?
That makes sense from a framing point of view, but I have some questions.
1. How do I fasten the plate to the sill? Just nail it down, then nail the sheathing into the bottom plates? Or should the bolt run through both the sill and bottom plates?
2. I assume either way I drill matching holes in the bottom plates to align with the bolts? If i only bolt down the sill then the holes in the bottom plate will need to be wider to accommodate the washer/nut.
Does that mean he's anticipating a bottom plates ontop of the sill plate?
That makes sense from a framing point of view, but I have some questions.
1. How do I fasten the plate to the sill? Just nail it down, then nail the sheathing into the bottom plates? Or should the bolt run through both the sill and bottom plates?
2. I assume either way I drill matching holes in the bottom plates to align with the bolts? If i only bolt down the sill then the holes in the bottom plate will need to be wider to accommodate the washer/nut.