To avoid these ads, REGISTER NOW!

Break ground in 1 week!

petethekiller

Well-known member
Joined
Dec 8, 2013
Messages
47
Location
Blanchard Oklahoma
The wife and I just purchased a new construction home that we are just thrilled with. The house sits on a 1.6 acre lot that backs up to Dairy cow pasture, beautiful scenery. With the new house I will be building a new 30x50x12 insulated Post and Beam shop that will have 30x40 work space, 10x20 lounge/office and 5x10 bathroom and a 5x10 mechanical room.

At my previous house I built a metal 30x40x10 myself... looked great but I really regretted not insulating the building at time of construction. I get to learn from my mistakes this time around.

I expect to have the building erected in the next 4 weeks then over the next 6 months frame and finish the interior office/bath and run electric/plumbing and pneumatic lines.

In the photo you will see my 5.7L Hemi powered Jeep Wrangler...it is currently sitting in the location of the shop building.
 

Attachments

  • 20160723_130111.jpg
    20160723_130111.jpg
    145.8 KB · Views: 97
  • 20160723_130130.jpg
    20160723_130130.jpg
    147.1 KB · Views: 90
  • 12764468_591269611029930_5212557133161304387_o.jpg
    12764468_591269611029930_5212557133161304387_o.jpg
    139.3 KB · Views: 74
To avoid these ads, REGISTER NOW!
OP
P

petethekiller

Well-known member
Joined
Dec 8, 2013
Messages
47
Location
Blanchard Oklahoma
I plan on it.... gonna be doing this one right. As it will be both shop and man cave. My previous 30x40 had a Home theater system that could be felt from 300ft away! the new one will be even better. All new speaker and sub designs which will be more accurate and a lot more efficient (louder).

Going with LED lighting this time around for when I do actual work in there I wont be waiting for the lights to warm up in the winter months.

I estimate it will take 6 months to get it the way I want it... I want nice finishes in the office/lounge area.
 
To avoid these ads, REGISTER NOW!
OP
P

petethekiller

Well-known member
Joined
Dec 8, 2013
Messages
47
Location
Blanchard Oklahoma
The building supplies got dropped off today, I expect the poles to be erected by Thursday pm. From there I do all my rough plumbing over the weekend and concrete on Monday!
 

Attachments

  • 13659157_10207137668739835_4776368601941250251_n.jpg
    13659157_10207137668739835_4776368601941250251_n.jpg
    79.3 KB · Views: 18

LXCam

ALLIANCE MEMBER
Joined
Apr 23, 2013
Messages
19,090
Location
AZ
That's awesome bud. The house is gorgeous btw, will you be doing anything architectural with the building as well to match the house?
 
OP
P

petethekiller

Well-known member
Joined
Dec 8, 2013
Messages
47
Location
Blanchard Oklahoma
That's awesome bud. The house is gorgeous btw, will you be doing anything architectural with the building as well to match the house?

Not really, just try to match color as best as possible. Tan walls and brown roof, trim and wainscoat. It should look nice but nothing spectacular, Im on a budget. :) :beer:
 
To avoid these ads, REGISTER NOW!